Archive for the ‘Wally 164’ Category

Better Place delivered to Ancona

Thursday, August 20th, 2009

Better Place was launched in Fano and towed to Ancona. The operation was completed in about 9 hours.

Big day in Fano

Sunday, March 15th, 2009

This is the rollover of the Wally 164, now ready for fitting out. Enjoy.

Spring preparations

Thursday, February 12th, 2009

B78 KeelIn Finland and Italy the final preporations are being made before the launch of the Baltic 78 and Wally 100 respectively. The Baltic 78s keel fin is being welded and with almost the exact weight and center of gravity of the boat known from loadcells under the hull, the final bulb design is concluded.  known Also in Fano the hull of the Wally 164 nears completion the bulkheads are in and hull is faired, we expect to turn the hull in March.


No New Years Hangover

Thursday, January 22nd, 2009

 

Henry's Autoclave

Henry's Autoclave

 

Inside masthead

Inside masthead

WY 164 Fairing

WY 164 Fairing

No time to waste this year we were lucky to start with a visit to Hall Spars in Rhode Island. The willingness to work with new ideas, quality of carbon and seamless tubes is spectacular. Thanks to project manager Henry MaxwellThe Wally 164 is being faired in sections using a new method by Ian Armstrong as tested on Maltese Falcon. Reports are good both for initial quality and longevity, we shall see. 

Lady L & Wally 164

Monday, March 17th, 2008

The Hull Moulds of the Wally 164 are finished and Lamination is started.

wally-164-mould

 

 

The outer deck skin of the Baltic 76 Lady L is infused with resin.

baltic-76-infusion

Wally 100.03

Sunday, February 17th, 2008

The hull of Wally 100.03 is turned as the bulkheads are finished. Systems installation has started.

Lady L and Wally 164

Thursday, January 17th, 2008

Lamination on the outer skin of the Baltic 76 ‘Lady L is nearly finished.

The plug for the semi hulls of the Wally 164 is now under construction in Fano Laminating should start at the end of February.