In Finland and Italy the final preporations are being made before the launch of the Baltic 78 and Wally 100 respectively. The Baltic 78s keel fin is being welded and with almost the exact weight and center of gravity of the boat known from loadcells under the hull, the final bulb design is concluded. known Also in Fano the hull of the Wally 164 nears completion the bulkheads are in and hull is faired, we expect to turn the hull in March.